Product Detail :
|
Manufacturing testing and delivery of “waste heat box, breeches pipes, air inlet box and air inlet box with lean gas connection” on f.o.r. rourkela steel plant site basis as detailed in the enclosed technical specification (ts) no. mec/s/a237/a/10/c1/0208, 0209, 0210 & 0211 required for rebuilding of coke oven battery no. 2 project of steel plant.
|