Product Detail :
|
Koraput-Jagdalpur Doubling Project on KK line Design, Proof checking,
Construction, Testing and Commissioning of Ballast less track including other allied
works for Seven Tunnels (Tunnel No.T1-From Ch. 1705 m to 2010, T1A-From Ch.
2160 m to 2400, T2 -From Ch. 3240 m to 3560 m, T3-From Ch. 4513m to 4620m,
T4-From Ch. 5120m to 5400 m, T5-From Ch. 6150 m to 6320 m & T6 -From 10027-
10312 m (Total -1987= Tunnel Length of 1707 m Plus 280 m i.e., length of
Approaches on either side of tunnels ) between Jarati & Maliguda stations in
connection with Jagdalpur-Koraput Doubling Project of East Coast Railway
|
Tender Detail : |
Koraput-Jagdalpur Doubling Project on KK line: Design, Proof checking,
Construction, Testing and Commissioning of Ballast less track including other allied
works for Seven Tunnels (Tunnel No.T1-From Ch. 1705 m to 2010, T1A-From Ch.
2160 m to 2400, T2 -From Ch. 3240 m to 3560 m, T3-From Ch. 4513m to 4620m,
T4-From Ch. 5120m to 5400 m, T5-From Ch. 6150 m to 6320 m & T6 -From 10027-
10312 m (Total -1987= Tunnel Length of 1707 m Plus 280 m i.e., length of
Approaches on either side of tunnels ) between Jarati & Maliguda stations in
connection with Jagdalpur-Koraput Doubling Project of East Coast Railway |