Product Detail :
|
Renovation of Canal System of Hirakud Dam Project (Andharibanjhi Canal Section, Barpali Irrigation Division, Barpali) ,2.0 ,Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area with all leads, lifts, sundries, T&P required for the work etc. complete as per the direction of Engineer-in-charge. ,Earthwork exavation of foundation in hard soil including dressing and levelling the bed and depositing the excavated materials away from the work site with all leads, lifts, sundries, T&P required for the work etc complete as directed by the Engineer in Charge ,Filling foundation and plinth with sand including cost, conveyance & royalty of all materials to the work site including watering & ramming with all leads, lifts, sundries & T&P etc . complete, as per direction of Engineer-in-Charge. ,Cement concrete M-15 using 40 mm & down graded H.G.C.B. Chips free from weathered skin surface including cost, carriage royalty and taxes of all materials to the work site mixing and laying of concrete in position and compacted properly with all leads, lifts, sundries, T & P required for the work etc. complete as per the Direction of the Engineer in charge. ,Cement concrete M-20 with hard granite coarse aggregates of maximum nominal size 20mm and down graded free from weathered skin including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per the direction of Engineer-in-charge. ,Rigid smooth centering & shuttering for cement concrete works including false work & dismantling after casting and clearing the debries from worksite with all leads,lifts, sundries including cost ,conveyance labour T&P etc. complete as directed by Engineer-in-charge ,Supplying, fitting and placing uncoated HYSD bar reinforcement complete as per drawing and technical specification including cost, convenyance and royality of all materials to site, T&P sundries, etc. complete as per direction of Engineer- in- charge ,Filling in foundation and Plinth with excavated materials incluiding watering ,ramming etc complete as per direction of Engineer in charge ,Exavation of any type of soil in approved borrow area by mechanical means loading into & transportation by mechanical means & unloading the soil with all lead on properly prepared surface including breaking clods to maximum 5cm to 7cm & laying in layers not exceeding 22.5 cm with all leads,lifts, sundries including cost ,conveyance labour T&P etc. complete as directed by Engineer-in-charge ,Supplying, laying and fixing NP3 class R.C.C. hume pipe in position and joining with necessary twisted and coal tarred hemp yarn including crawling and filling the joing with C.M. (11) including cost, carriage, royalty, taxes etc. of hume pipe and all other materials as per specification of the department.
|
Tender Detail : |
Renovation of Canal System of Hirakud Dam Project (Andharibanji Canal Section, Barpali Irrigation Division, Barpali) #*. Renovation of Canal System of Hirakud Dam Project (Andharibanji Canal Section, Barpali Irrigation Division, Barpali) |